ISO 9001 Certified Industrial Engineers

Cooling Tower AMC, Repair & Overhaul Specialist

One trusted partner for every cooling tower need — inspection, troubleshooting, FRP casing repair, fan balancing, motor overhaul, and genuine OEM spare parts — from a team that knows your tower's complete history.

Instant WhatsApp Chat
30+ Years
Engineering Heritage
1,000+
Towers Maintained
24/7 SLA
Emergency Dispatch
100%
Genuine OEM Spares
3D FRP COOLING TOWER • DENSE MIST BLAST
Aerixon Turnkey Projects - Hero Banner

We offer complete turnkey solutions covering everything from initial design to final installation and handover. Our team manages the entire scope of work in-house, including civil work, electrical fitting, plumbing, and finishing — so clients don't need to coordinate with multiple contractors. From planning and procurement to execution and quality checks, we handle it all under one roof. You simply approve the design, and we take care of the rest from start to finish, delivering a ready-to-use project without any hassle.

24/7 SLA Field Support • Genuine OEM Spare Parts • ISO 9001 Auditable Reports • Laser Motor Shaft Alignment • Aerodynamic Fan Blade Balancing • FRP Casing & Basin Re-Glassing • 24/7 SLA Field Support • Genuine OEM Spare Parts • ISO 9001 Auditable Reports • Laser Motor Shaft Alignment • Aerodynamic Fan Blade Balancing • FRP Casing & Basin Re-Glassing
Industrial Core Capabilities

10 Specialized Cooling Tower Services

Industrial cooling tower inspection, component repair, OEM spare parts, and complete 365-day AMC maintenance by ISO 9001 certified engineers.

Aerixon Industrial Chillers - Hero Banner

Comprehensive installation, chemical condenser descaling, compressor overhaul, refrigerant optimization, and efficiency tuning for industrial process chillers and central cooling plants. Maximize refrigeration COP and eliminate unexpected process downtime.

Aerixon Piping Engineering - Hero Banner

Precision 3D isometric piping layout, high-pressure utility line routing, MS/SS pipe fabrication, hydro-testing, thermal stress analysis, and leak-proof flange jointing. Delivered with certified orbital welding for zero-leak process fluid headers.

AERIXON HVAC System Architecture - Technical Blueprint
Predictable Maintenance ROI

Selected Plan: Standard AMC (Just ₹109 / day per tower)

At ₹40,000 / year per tower, protection is fixed — avoiding catastrophic downtime and unbudgeted emergency repair bills.

Included Engineering Deliverables: ENTRY TIER
Plant Cost Calculator
ESTIMATOR
2 Towers
Total Annual Cost
₹80,000
Effective Daily Cost
₹219 / day
ESTIMATED RISK SAVINGS

Saves approx. ₹1,70,000 in emergency callouts and lost production.

ANNUAL MAINTENANCE CONTRACT (AMC) PLANS

Choose Your Annual Protection Tier

Predictable annual operating budgets, zero emergency downtime charges, and guaranteed 24/7 SLA response times backed by specialized cooling tower engineers.

ENTRY TIER

Standard AMC

₹40,000 / year
Just ₹109 / day
Scheduled Visits: 4 Visits / Year
Predictive Alerts: Basic Visual Checks
Spare Parts: Genuine OEM Parts
Reports: Checklist Report
Emergency Support: Standard Phone & Ticket
RECOMMENDED • MOST POPULAR
BEST VALUE FOR FACTORIES

Premium AMC

₹50,000 / year
Just ₹137 / day
Scheduled Visits: 6 Scheduled PM Visits / Year
Predictive Alerts: Parts Flagged & Replaced Early
Spare Parts Sourcing: Priority OEM Sourcing
Inspection Reports: Detailed Engineering Report
Emergency Support: Priority 24/7 SLA Response
HEAVY INDUSTRIAL

Heavy Industrial

₹80,000 / year
Just ₹219 / day
Scheduled Visits: 10 PM Visits + 24/7 SLA
Predictive Alerts: Vibration & Thermal Trending
Spare Parts: Reserved OEM Stock Buffer
Reports: Full Structural & Gearbox Audit
Emergency Support: Dedicated Lead Engineer
Before You Ask

Frequently Asked Questions

Clear answers to common questions about cooling tower AMC contracts and service expectations.

Your in-house team covers dozens of equipment types across the plant. We work on industrial cooling towers exclusively — providing deep, specialized technical knowledge in aerodynamics, FRP structures, gearboxes, and drift control that complements your team's broad breadth.

Direct Technical Contact

Get In Touch With Engineering

Speak directly with a cooling tower specialist today for immediate technical assistance, AMC quotes, or emergency dispatch.

"Your cooling tower doesn't take a day off. Neither do we."

— AERIXON ENGINEERS Team Guarantee

Request Technical Call-Back / Quote

Fill in your plant details below for a quick response and custom AMC estimate.

Call Now WhatsApp